G-000Guides

Guides

The paperwork side of a renovation job, written down

Six guides for UAE renovation and fit-out contractors, and two written for your client so you can send a link instead of explaining it again.

14 days from approval, card required, cancel before it ends. A person reads every application, usually the same day.

For your client

Two you can send instead of explaining it again

A homeowner who has never renovated does not know what a provisional sum is, or why a deposit is normal. These two answer that in their words, not yours. Send the link with your quote and you get fewer calls, and a client who understands what they are accepting.

Maintenance

A review date, not a publication date

These are not blog posts, so they carry no publication date. They carry the date we last checked them against the authority that owns each rule. On the three guides that touch UAE rules, every stated fact links to a government source you can open yourself.

Last reviewed

General notes

  1. An indicative range is a range, not a price. Only the quote you send your client is a price.

  2. A person accepts every number before it leaves your company. Nothing drafted by AI becomes the record on its own.

  3. Your client never pays for Briked. Answering your scope link, reading your quote and accepting it are free for them, always.

  4. Your rates, your scopes and your clients stay yours. We never show one contractor’s work to another. Read the data promise

  5. The trial runs 14 days from the day we approve your application. A card is required to start it. Trial terms

Scope it, quote it, get it accepted — on your next job, with your rates.

14 days from approval, card required, cancel before it ends. A person reads every application, usually the same day.