Office fit-out in Dubai: what decides the cost

CAT A is what the landlord handed you. CAT B is your company. Here is what moves the number between them, what a fit-out quote has to contain, and how to get an indicative range from a licensed contractor.

14 days from approval, card required, cancel before it ends. A person reads every application, usually the same day.

A freshly laid grey blockwork partition wall inside an unfinished interior, raked by a single work light.

What moves the number

Room count moves it further than floor area does

Every partition is a wall, a ceiling change, a light, a sprinkler head and a detector. That is why two floors of identical area quote differently: one is open plan with a tea point, the other is fourteen rooms and a boardroom.

  1. What CAT A left you

    Raised floor, ceiling grid, base lighting and the cooling layout come with the shell. What is already there decides how much of your fit-out is addition rather than replacement.

  2. Open, cellular, or both

    Rooms are the expensive unit. Each one carries partitions, a door, a ceiling adjustment, lighting, cooling and its own life-safety devices.

  3. Fire and life safety

    Sprinklers, detection, emergency lighting and escape routes are redesigned around the new plan and reviewed before anyone occupies. This is the item that moves programmes.

  4. Services and data

    Small power, structured cabling, the comms room and the AV in the meeting rooms. A meeting room that works is a services scope, not a furniture order.

  5. The lease conditions

    Approval deposits, after-hours working, nominated contractors for certain trades, and the make-good clause waiting at the end of the term. All four price the job.

What a real quote contains

A room schedule the drawings agree with

A fit-out quote is comparable when it is priced against a room schedule and a named drawing revision, states what it assumes about the base build, separates the life-safety works, and lists what is excluded — furniture, IT hardware, landlord fees.

Sample
SectionWhat it coversWhat the quantities rest on
Enabling and protectionBase-build survey, protection to lift lobbies and common areas, after-hours access arrangementsMeasured on site
Partitions and doorsGlazed and blockwork partitions, acoustic infill, doors and ironmongery to the room scheduleFrom the approved drawings
Services alterationsSprinkler and detector relocation, emergency lighting, diffuser and thermostat changes, small powerContractor measured
Ceilings, floors and finishesCeiling grid adjustment, carpet and vinyl, paint and feature finishesMeasured on site
Data, AV and commissioningStructured cabling, comms room, meeting-room AV, testing and as-built recordsClient-reported schedule
A quote in sections view, badged as a sample. The amounts sit behind each section; what is shown is the structure a fit-out quote needs.

Approvals for this job

Three gates, and none of them is optional

General information, not advice, and the sequence differs by zone. The tenant is the applicant and the fit-out contractor normally submits. Briked records the scope, the drawing revision it was priced against and who accepted it — it does not file applications or obtain permits.

  • Landlord and building approval

    Building management approves the drawings, the contractor and the working hours, usually against a refundable deposit and insurance. Nothing reaches site before it is issued.

    Authority: Your landlord or building management

  • The authority governing your zone

    The municipality licenses most of the city; a free zone or master-development zone is governed by its own authority. Fit-out drawings are approved there before work starts.

    Authority: Dubai Development Authority

  • Fire and life-safety review

    Changes to sprinklers, detection and escape routes are reviewed against civil defence requirements, and the completion certificate is what lets you occupy. Build the review into the programme.

    Authority: Dubai Civil Defence

Both sides of the same office

The tenant describes it; you get a room schedule

Your client is a company, not a household, and they answer between meetings. They send the landlord’s floor plan, the room count they need and a voice note about the comms room. It arrives as a structured scope you can price against a drawing revision.

Plan your project

Whole floor, handed over as CAT A last month.

Four meeting rooms and a boardroom; the rest open plan.

Landlord’s floor plan attached, plus a voice note about the comms room.

Your clientYour client describes the office they took and the one they need.
Structured scope · officeReceived from your scope link

Meeting rooms · 4

Client-reported

Boardroom · glazed partition

From the client’s drawings

Base build · CAT A confirmed

Contractor measured

Sprinkler and detector relocation

From the client’s drawings
YouThe same office arrives structured, with the base-build condition recorded beside it.

For contractors

How Briked structures an office fit-out

A fit-out is argued over revisions. Every quantity carries its source and every quote carries the drawing revision it was priced against, so a variation becomes a comparison rather than a memory. You accept each line, and the tenant accepts the version.

Where each quantity came from

  • Client-reported
  • From the approved drawings
  • Measured on site

What each payment is tied to

  1. Approvals issued
  2. Partitions and first fix
  3. Ceilings and finishes
  4. Commissioning and handover
The base-build assumption and the revision a price belongs to — the two records a variation is settled with.

General notes

  1. An indicative range is a range, not a price. Only the quote you send your client is a price.

  2. A person accepts every number before it leaves your company. Nothing drafted by AI becomes the record on its own.

  3. Your client never pays for Briked. Answering your scope link, reading your quote and accepting it are free for them, always.

  4. Your rates, your scopes and your clients stay yours. We never show one contractor’s work to another. Read the data promise

  5. The trial runs 14 days from the day we approve your application. A card is required to start it. Trial terms

Common questions

What is the difference between CAT A and CAT B?

CAT A is the landlord’s base finish: raised floor, ceiling grid, base lighting, cooling and the systems that serve an empty floor. CAT B is everything that makes it your company — partitions, rooms, finishes, data, AV and branding.

How long does an office fit-out take in Dubai?

The front end is approvals, and the long pole is usually the life-safety review, because occupation depends on it. Construction compresses; sign-offs do not. Ask for a programme that shows the approval dates, not only the trade weeks.

Who has to approve an office fit-out?

Building management approves the drawings, the contractor and the hours; the authority that governs your zone approves the works; and changes to sprinklers, detection and escape routes are reviewed against civil defence requirements before you occupy.

What does a make-good clause mean for my budget?

Many leases require the space returned to its CAT A condition at the end of the term. Price it as a known future scope while you still have the drawings and the room schedule, rather than discovering it in the last month of a lease.

Why is there no cost per square foot on this page?

Because it would mislead. Room count, what CAT A actually left behind and the extent of the life-safety works move the number more than area does. An indicative range from a contractor who has seen your plan is worth more than a rate, and a range is not a price.

Does my company pay anything to answer a contractor’s link?

No. Answering the questions, reading the quote and accepting it are free, with no account to create. The contractor pays for Briked.

Scope it, quote it, get it accepted — on your next job, with your rates.

14 days from approval, card required, cancel before it ends. A person reads every application, usually the same day.