How to read a renovation quote

You have a quote from a contractor and no way to judge it. This walks through what each part is telling you, and what is worth asking before you accept.

14 days from approval, card required, cancel before it ends. A person reads every application, usually the same day.

For your clientLast reviewed

Orientation

Start at the top, before the numbers

The first part of a quote tells you who is offering, for what property, under which reference, and until when. If those are missing, ask for them before reading anything priced — not because the contractor is doing something wrong, but because you will need them if you accept.

Sample
Who is quoting
The company as licensed, with a trade licence number you can check.
For which property
The address the work happens at — check it is yours.
Reference
The number to quote in every message about this job.
Valid until
After this date the contractor may re-price. Material costs move.
Tax
Whether the totals shown include tax or have it added.
The top of a quote, and what each line tells you. Sample.

The scope

Read the exclusions before you read the price

The list of what is not included tells you more than the total does. Two quotes that look far apart often differ only in what one of them left out. Read the exclusions first, then compare the scope lines room by room.

  • Is every room you want done actually listed?
  • Who is supplying the tiles, the sanitaryware, the appliances?
  • Is making good after the work included?
  • What has been assumed about what is behind the walls?

The money

Look for the parts that are still open

A total is not a single promise. Some of it is fixed, some is a placeholder for a choice you have not made, and some depends on what is found when the walls come off. A contractor who marks those clearly is being straight with you, not vague.

  • Section totals — so you can drop a room without redoing the whole quote.
  • Provisional sums — a placeholder until you choose the finish.
  • A tax line, shown separately.
  • The payment milestones, and what closes each one.

Validity

A quote is an offer with a shelf life

Materials and labour move. A validity date is normal and not a pressure tactic. If you need longer, ask — most contractors will re-issue rather than lose the job. What you should not do is accept a quote whose date has passed and assume the price still stands.

Before you accept

Five questions worth asking

None of these are confrontational, and a contractor who has done the work will answer them in a minute. If a question cannot be answered, that is information too — usually that the scope has not been thought through, which is what turns into changes later.

  • What is not included that I might expect to be?
  • Which items are provisional, and what would replace them?
  • What approvals are needed, and who is getting them?
  • What happens to the price if you find something behind the wall?
  • What are the payment milestones, and what closes each one?

How Briked handles this

If your quote arrived as a link, it can answer some of this itself

A quote sent through Briked opens on your phone with its sections, its exclusions and its milestones laid out, and it shows where each quantity came from — what you told your contractor, or what they measured at the site visit. Briked is your contractor’s tool. You never pay for it.

Quote QT-2026-041

Your apartment, Dubai Marina

Sections
6
Provisional items
2, marked
What Briked costs you
Nothing
Accepting is a click and a six-digit code sent to your own number.
Your clientThe quote, on your phone.

Quote QT-2026-041

Sent 2026-09-04

Opened by client
Yes
Questions raised
1
Revision
B
Accepted
Waiting
Your contractor sees that you opened it. Nothing else about your phone.
YouThe same quote, on your contractor’s screen.

General notes

  1. An indicative range is a range, not a price. Only the quote you send your client is a price.

  2. A person accepts every number before it leaves your company. Nothing drafted by AI becomes the record on its own.

  3. Your client never pays for Briked. Answering your scope link, reading your quote and accepting it are free for them, always.

  4. Your rates, your scopes and your clients stay yours. We never show one contractor’s work to another. Read the data promise

  5. The trial runs 14 days from the day we approve your application. A card is required to start it. Trial terms

Common questions

Do I pay anything to use Briked?

No. Reading a quote, asking a question about it and accepting it are free for you, always. Your contractor pays for the tool; you never do.

Is a quote the same as a contract?

No. A quote is an offer. It usually becomes the scope the contract refers to once you accept it, but the contract adds the programme, how changes are handled, and what happens after handover.

What is a provisional sum?

An amount held for something you have not chosen yet — tiles, taps, appliances. It is a placeholder, and it is replaced with a real figure once you pick. If a quote has several, expect the total to move.

Should I get three quotes?

Comparing is sensible, but compare the scope before the total. Quotes that differ by a lot usually differ in what they exclude, not in the rate for the same work.

The quote arrived as a WhatsApp link. Is that normal?

Yes — most renovation work in the UAE is arranged that way. A link is better than a photo of a page: it opens on your phone, it stays current if the contractor revises it, and you can accept it without printing anything.