Kitchen renovation in Dubai: what decides the cost
A kitchen is a joinery job with plumbing and power attached, and it is priced by decisions rather than by area. Here is what moves the number, what belongs in the quote, and how to get an indicative range.
14 days from approval, card required, cancel before it ends. A person reads every application, usually the same day.


What moves the number
Five decisions, taken before anyone measures
Length of run tells you very little on its own. A kitchen is priced by whether the services move, what the carcass and the fronts are made of, which worktop you choose and who supplies the appliances. Settle those five and two contractors can finally quote the same thing.
Whether the layout moves
Leave the sink, hob and appliances where they are and the job stays joinery and finishes. Move them and you add drainage falls, new circuits and, in a tower, an approval.
Carcass, front and hardware
The board the box is made from, the material on the door and the hinges behind it are three separate decisions. Two kitchens that look alike in a showroom rarely share all three.
Worktop and splashback
Laminate, engineered stone, sintered surface or natural stone. The material sets the template-and-fit sequence, and the sequence sets the programme.
Appliances and extraction
Who supplies the appliances, and whether the hood recirculates or ducts to an existing outlet, changes the scope far more than the brand on the front does.
Lead time
Made-to-order fronts and imported units arrive on their own schedule. A kitchen quote without a delivery window is half a quote.
What a real quote contains
A materials schedule, not a single line
“Supply and install kitchen” is not a quote. The version you can compare names the carcass, the front, the worktop and the hardware, says who supplies the appliances, lists what is excluded, and gives a delivery window alongside the payment schedule.
| Section | What it covers | What the quantities rest on |
|---|---|---|
| Strip out and making good | Removing existing units, worktop and splashback, capping services, disposal | Measured on site |
| Services adjustment | Water, drainage and power adjusted to the layout; a dedicated circuit for the oven | Contractor measured |
| Cabinetry | Base, wall and tall units, drawers and hardware, made to the survey dimensions | From the site survey |
| Worktop and splashback | Templated after the cabinetry is set, fabricated and fitted with sink and hob cut-outs | Templated on site |
| Appliances and finishing | Appliance installation, extraction connection, sealing and the handover clean | Client-reported schedule |
Approvals for this job
Mostly none — until the services move
A like-for-like kitchen rarely needs a permit. The moment water, drainage or a new circuit moves, that changes, and in a tower the building has a view as well. General information, not advice: Briked records what you agreed and when, and does not file applications.
Moving water or drainage
A kitchen that stays where it is usually needs no permit. Adding a dishwasher point or relocating the sink changes the drainage, which in most buildings means an approval and sometimes a municipality one.
Authority: Dubai Municipality
Electrical works
A new oven circuit or a relocated distribution board is licensed electrical work. Ask which trade licence covers it, and keep the certificate with your handover pack.
Authority: DEWA
Delivery windows
In an apartment the building sets the lift booking and the delivery window. A made-to-order kitchen that arrives outside it waits, so confirm the window before the fabrication date is fixed.
Authority: Your building management
Both sides of the same kitchen
Photographs and a voice note beat a phone call
Your client sends what they have: a few photographs, the rough run length, what they want kept. It arrives as a structured scope with the survey dimensions still marked as outstanding, so nothing is treated as measured that has not been.
Galley kitchen, one window, roughly six metres of run.
Keeping the layout — new units, new worktop, same appliances.
Three photos and a voice note about the extraction.
Run length · to survey
Worktop · engineered stone
Layout · unchanged
Cabinet run · set out on the visit
For contractors
How Briked structures a kitchen job
The client’s rough run length never becomes your fabrication dimension by accident: it stays labelled until your survey replaces it. Price the schedule against your own rate card, accept each line yourself, and tie the payments to the sequence the kitchen actually follows.
Where each quantity came from
- Client-reported
- Measured on the survey
- From the appliance schedule
What each payment is tied to
- Deposit and survey
- Strip out and first fix
- Cabinetry installed
- Worktop fitted and handover
Read next
Where the kitchen sits in the loop
The questionnaire is what your client answers, the priced scope is where the schedule gets its numbers, and the quote is what you send. The persona pages cover the trade around it.
How Briked does this
Who it’s for
Go deeper
General notes
An indicative range is a range, not a price. Only the quote you send your client is a price.
A person accepts every number before it leaves your company. Nothing drafted by AI becomes the record on its own.
Your client never pays for Briked. Answering your scope link, reading your quote and accepting it are free for them, always.
Your rates, your scopes and your clients stay yours. We never show one contractor’s work to another. Read the data promise
The trial runs 14 days from the day we approve your application. A card is required to start it. Trial terms
Common questions
How long does a kitchen renovation take in Dubai?
Two clocks run at once. On site the work is short; the fabrication lead time on made-to-order fronts, and the worktop template that can only happen after the cabinetry is installed, are what set the date. Ask for both in the programme.
Can I keep my existing appliances?
Usually, if the openings suit them. Cut-outs are made to specific models, so the appliance list has to be fixed before fabrication starts. A late change to a hob or an oven is a new worktop, not an adjustment.
Do I need approval to change my kitchen?
Not normally for a like-for-like replacement. Moving the sink, adding a dishwasher point or running a new circuit changes that, and in an apartment the building will want to approve the works and the contractor regardless.
Why is there no price per metre here?
Because a metre of kitchen is not a unit of anything until the carcass, the front, the worktop and the appliances are chosen. An indicative range from a contractor who has seen your photographs is more useful than a rate, and a range is not a price.
What should a kitchen quote contain?
A survey dimension or a note that one is outstanding, a materials schedule covering carcass, front, worktop and hardware, who supplies the appliances, what is excluded, a delivery window and a payment schedule.
Do I pay to answer my contractor’s link?
No. It is free for you, there is no app and no account, and you can answer in Arabic or English. Your contractor pays for Briked.
Scope it, quote it, get it accepted — on your next job, with your rates.
14 days from approval, card required, cancel before it ends. A person reads every application, usually the same day.