A-203Kitchen renovation, Dubai

Job sheet · Dubai

Kitchen renovation in Dubai: what decides the cost

A kitchen is a joinery job with plumbing and power attached, and it is priced by decisions rather than by area. Here is what moves the number, what belongs in the quote, and how to get an indicative range.

14 days from approval, card required, cancel before it ends. A person reads every application, usually the same day.

A Dubai villa kitchen halfway through installation: base cabinets set, a tall unit still wrapped, a stone worktop resting on trestles.

What moves the number

Five decisions, taken before anyone measures

Length of run tells you very little on its own. A kitchen is priced by whether the services move, what the carcass and the fronts are made of, which worktop you choose and who supplies the appliances. Settle those five and two contractors can finally quote the same thing.

  1. Whether the layout moves

    Leave the sink, hob and appliances where they are and the job stays joinery and finishes. Move them and you add drainage falls, new circuits and, in a tower, an approval.

  2. Carcass, front and hardware

    The board the box is made from, the material on the door and the hinges behind it are three separate decisions. Two kitchens that look alike in a showroom rarely share all three.

  3. Worktop and splashback

    Laminate, engineered stone, sintered surface or natural stone. The material sets the template-and-fit sequence, and the sequence sets the programme.

  4. Appliances and extraction

    Who supplies the appliances, and whether the hood recirculates or ducts to an existing outlet, changes the scope far more than the brand on the front does.

  5. Lead time

    Made-to-order fronts and imported units arrive on their own schedule. A kitchen quote without a delivery window is half a quote.

What a real quote contains

A materials schedule, not a single line

“Supply and install kitchen” is not a quote. The version you can compare names the carcass, the front, the worktop and the hardware, says who supplies the appliances, lists what is excluded, and gives a delivery window alongside the payment schedule.

Sample
SectionWhat it coversWhat the quantities rest on
Strip out and making goodRemoving existing units, worktop and splashback, capping services, disposalMeasured on site
Services adjustmentWater, drainage and power adjusted to the layout; a dedicated circuit for the ovenContractor measured
CabinetryBase, wall and tall units, drawers and hardware, made to the survey dimensionsFrom the site survey
Worktop and splashbackTemplated after the cabinetry is set, fabricated and fitted with sink and hob cut-outsTemplated on site
Appliances and finishingAppliance installation, extraction connection, sealing and the handover cleanClient-reported schedule
A quote in sections view, badged as a sample. The amounts sit behind each section; what is shown here is the structure a kitchen quote needs.

Approvals for this job

Mostly none — until the services move

A like-for-like kitchen rarely needs a permit. The moment water, drainage or a new circuit moves, that changes, and in a tower the building has a view as well. General information, not advice: Briked records what you agreed and when, and does not file applications.

  • Moving water or drainage

    A kitchen that stays where it is usually needs no permit. Adding a dishwasher point or relocating the sink changes the drainage, which in most buildings means an approval and sometimes a municipality one.

    Authority: Dubai Municipality

  • Electrical works

    A new oven circuit or a relocated distribution board is licensed electrical work. Ask which trade licence covers it, and keep the certificate with your handover pack.

    Authority: DEWA

  • Delivery windows

    In an apartment the building sets the lift booking and the delivery window. A made-to-order kitchen that arrives outside it waits, so confirm the window before the fabrication date is fixed.

    Authority: Your building management

Both sides of the same kitchen

Photographs and a voice note beat a phone call

Your client sends what they have: a few photographs, the rough run length, what they want kept. It arrives as a structured scope with the survey dimensions still marked as outstanding, so nothing is treated as measured that has not been.

Plan your project

Galley kitchen, one window, roughly six metres of run.

Keeping the layout — new units, new worktop, same appliances.

Three photos and a voice note about the extraction.

Your clientYour client photographs the kitchen and says what stays and what goes.
Structured scope · kitchenReceived from your scope link

Run length · to survey

Client-reported

Worktop · engineered stone

Client-reported

Layout · unchanged

Client-reported

Cabinet run · set out on the visit

Contractor measured
YouThe same kitchen arrives structured, with the survey dimensions still marked outstanding.

For contractors

How Briked structures a kitchen job

The client’s rough run length never becomes your fabrication dimension by accident: it stays labelled until your survey replaces it. Price the schedule against your own rate card, accept each line yourself, and tie the payments to the sequence the kitchen actually follows.

Where each quantity came from

  • Client-reported
  • Measured on the survey
  • From the appliance schedule

What each payment is tied to

  1. Deposit and survey
  2. Strip out and first fix
  3. Cabinetry installed
  4. Worktop fitted and handover
A kitchen argument is nearly always about a dimension or a date. Both are recorded here.

General notes

  1. An indicative range is a range, not a price. Only the quote you send your client is a price.

  2. A person accepts every number before it leaves your company. Nothing drafted by AI becomes the record on its own.

  3. Your client never pays for Briked. Answering your scope link, reading your quote and accepting it are free for them, always.

  4. Your rates, your scopes and your clients stay yours. We never show one contractor’s work to another. Read the data promise

  5. The trial runs 14 days from the day we approve your application. A card is required to start it. Trial terms

Common questions

How long does a kitchen renovation take in Dubai?

Two clocks run at once. On site the work is short; the fabrication lead time on made-to-order fronts, and the worktop template that can only happen after the cabinetry is installed, are what set the date. Ask for both in the programme.

Can I keep my existing appliances?

Usually, if the openings suit them. Cut-outs are made to specific models, so the appliance list has to be fixed before fabrication starts. A late change to a hob or an oven is a new worktop, not an adjustment.

Do I need approval to change my kitchen?

Not normally for a like-for-like replacement. Moving the sink, adding a dishwasher point or running a new circuit changes that, and in an apartment the building will want to approve the works and the contractor regardless.

Why is there no price per metre here?

Because a metre of kitchen is not a unit of anything until the carcass, the front, the worktop and the appliances are chosen. An indicative range from a contractor who has seen your photographs is more useful than a rate, and a range is not a price.

What should a kitchen quote contain?

A survey dimension or a note that one is outstanding, a materials schedule covering carcass, front, worktop and hardware, who supplies the appliances, what is excluded, a delivery window and a payment schedule.

Do I pay to answer my contractor’s link?

No. It is free for you, there is no app and no account, and you can answer in Arabic or English. Your contractor pays for Briked.

Scope it, quote it, get it accepted — on your next job, with your rates.

14 days from approval, card required, cancel before it ends. A person reads every application, usually the same day.